What Is Horizontal Directional Drilling, Or How Do You Run A Pipeline Underneath A River?

Bayous, not quite swamps and not quite forests, are a unique feature of the landscape of southern Louisiana. In the bayous, small channels of shallow, slow-moving water separate patches of marshy ground where trees and plants grow either in the water or just at its edge. Given the soft soil, the area may seem like an odd place for pipelines, yet signs in the Atchafalaya Basin show that the area is crisscrossed by many different lines carrying crude oil and natural gas. Here, a technique called horizontal directional drilling becomes especially useful for pipeline constructors like Energy Transfer Partners. Using horizontal directional drilling, a pipeline can pass under a body of water or another obstruction without requiring that a traditional trench be dug or pipe buried, the company told InsideSources.

Get The Timeless Reading eBook in PDF

Get the entire 10-part series on Timeless Reading in PDF. Save it to your desktop, read it on your tablet, or email to your colleagues.

We respect your email privacy

Q2 hedge fund letters, conference, scoops etc

Drilling rigs are built on movable chassis. Their size depends on the diameter of the pipe that will be used for the final project. They are often controlled from a booth next to the rig and can be moved from job site to job site.

The process begins with the drilling of a pilot hole from one surface point to the other. Guided by a surveying system, a rotating drill head is passed through the entire length of the crossing. Although it stretches the entire span, this hole is smaller than the desired pipeline width. After this initial hole is bored, crews remove the surveying system and drill bit from the machine and run several “reaming passes” to make the opening wider.

To do so, a device called a reamer is attached to a drill string running through the entire length of the tunnel. On the other side of the road, stream, or other obstacle, a second rig is present to receive the reamer as it passes through. A steel drill string helps workers on each side monitor the location of the reamer.

To prevent the newly excavated area from collapsing and filling with soil it is pumped full of drilling fluid. Although it is called drilling fluid, the liquid is a mixture of water and bentonite. The clay gives the fluid enough viscosity to carry soil and debris back to the surface. This fluid passes through long sections of drill pipe into the drilling area.

The reaming process occurs in several passes, each using drill pipes slightly larger than the previous. The final hole is between 30 and 50 percent larger in diameter than the final pipeline diameter.

After the reamer has passed through completely, crews will often run a final pass with more mud to ensure that the opening is clear of all debris. Finally, the reamer is removed and the pipe is slowly pulled into the reamed hole. This itself is a delicate undertaking, as sections of pipe can easily be 33 feet long and nearly four feet in diameter.

Experts in the energy industry explain the end result is a minimally invasive road or waterway crossing, with no need for trenching or backfill.

Article by Erin Mundahl, Inside Sources

LEAVE A COMMENT


Saved Articles
X
TextTExtLInkTextTExtLInk

The Life and Career of Charlie Munger

Charlie is more than just Warren Buffett’s friend and Berkshire Hathaway’s Vice Chairman – Buffett has actually credited him with redefining how he looks at investing. Now you can learn from Charlie firsthand via this incredible ebook and over a dozen other famous investor studies by signing up below:

  • Learn from the best and forever change your investing perspective
  • One incredible tidbit of knowledge after another in the page-turning masterpiece of a book
  • Discover the secrets to Charlie’s success and how to apply it to your investing
Never Miss A Story!
Subscribe to ValueWalk Newsletter. We respect your privacy.

Congrats! Are you a smart person?

We have an exclusive targeted for being a sophisticated and loyal reader.

Sign up for ValueWalkPremium today and get our exclusive content for 35% off.

Use coupon code vip19 or click on the button below

Limited time offer only ENDS 12/31/2019 or after next 25 subscribers take advantage whichever comes first – please do not share this discount with others

 

0